Amazon Plans $100 Million Indiana Plant for Its Robot Network
Hardware / news
Amazon Plans $100 Million Indiana Plant for Its Robot Network
The 585,000-square-foot Greenwood factory will employ 300 people and open by 2028, but Amazon's announcement does not name a single robot it will build.

Amazon said Sept. 24 that it will invest more than $100 million in a 585,000-square-foot factory in Greenwood, Indiana, to make equipment for its fulfillment and robotics network across North America. The plant is due to launch by 2028 and will employ 300 people.
The announcement describes advanced fabrication, robotic welding, automated powder coating and assembly under one roof, run with AWS and A.I.-powered manufacturing systems. It describes the output as products that power the network. It does not name a drive unit, arm or any other robot.
What the 300 jobs and $100 million imply
Amazon said the jobs will pay an average of nearly $100,000 a year. Holly Sullivan, Amazon's vice president of economic development, said in the release: "This facility represents a significant investment in the Indianapolis community that will create jobs with a median salary well above the regional average."
The denominators are the useful part. A plant of 585,000 square feet with 300 staff has about 1,950 square feet per worker, which is the footprint of heavy fabrication and welding rather than assembly benches. The $100 million divided by 300 jobs is roughly $333,000 per job, a capital intensity that reads as machinery rather than headcount. Amazon calls the sum "more than" $100 million and gave no upper figure.
| Figure | Value | Source |
|---|---|---|
| Investment | More than $100 million | Amazon, Sept. 24 |
| Floor area | 585,000 sq ft | Amazon |
| Jobs | 300 | Amazon |
| Launch | By 2028 | Amazon |
| Robots built in U.S. to date | More than 1 million | Amazon |
Where it sits in Amazon's robot count
Amazon said it has built more than 1 million robots in the U.S., that they now operate across more than 300 facilities worldwide, and that they assist with 75% of the customer orders it delivers. Those are the company's figures; the release does not say how many are active or how many have been retired. The Robot Report said Amazon runs one of the world's largest industrial robotics manufacturing operations in Massachusetts.
Greenwood follows an August 2026 announcement of a robotics manufacturing investment in Texas. Amazon has invested more than $40 billion in Indiana since 2008, and the state holds 17 fulfillment and sortation centers and 7 delivery stations, according to the release. Amazon said it picked Greenwood for the manufacturing workforce, competitive costs and logistics infrastructure.
What Amazon did not say
A plant that welds and powder-coats is most plausibly making structural parts, such as frames, shelving or conveyance, rather than electronics. That is a reading of the process list, not something Amazon said. The release gives no output target in units, no product list and no date for the first shipment.
For a robot deployment reported with a hard denominator, compare Volvo's autonomous trucks passing 3 million tonnes hauled. Amazon's release gives a cumulative build count and no output target.
At the other end of the market, Feather Robotics' modular humanoid is priced at $29,990; Amazon says it has built more than 1 million robots in the U.S.
The number to watch is the first production date. Amazon has said 2028; a permit filing or a hiring page opening for the CNC and welding roles would be the first sign the schedule is holding.
Sources
More in Hardware
- 01Starship's Ship 42 Is Caught After 14 Orbits, and Two Reports Give Different Reasons the Booster Was NotFlight 15 returned an upper stage to the tower for the first time and dropped 26 Starlink V3 satellites; SpaceX has no reflight date in these accounts.
- 02Genesis AI Raises $500 Million at $3.5 Billion, and Its CEO Says Eno's Hands Last WeeksThe Paris robot maker has built 30 to 40 Eno units and chose a US contract manufacturer, with no price and no paying customer count.
- 03Tesla Cybercab's Eight NHTSA Crashes Include a 53 mph Highway Hit With a Test Driver AboardThe four driverless crashes stayed under 5 mph; the Robotaxi median pre-crash speed is 1 mph, which says more about the geofence than the software.
- 04Anthropic's Three-Day AMD Port Covered Prefill for One Model on MI355XThe roadshow slide credits Claude Mythos Preview with a six-to-12-month job; it leaves out decode, the kernel denominator and any Nvidia comparison.